Fifty Five Years Ago the Rock Bolts which hold up the Loose Rock and Cement Overlay in the Powerhouse were not properly grouted at Peace Power Mica Creek Dam located near Hudson Hope British Columbia.
Six months after I was denied my scheduled job at CNR System Headquarters assisting and working with Civil Engineers I obtained employment doing exactly that as a Recording Technician and in house Builder Quality Control Inspector with KBR BRJ Halliburton at Peace Power where Chief Engineer Abercrombie said to me "I think you and I are the only ones aware of exactly what we are building here". A few weeks later "I do not know where all the rock bolts are and what the torques are." There were many hundreds of Rock Bolts.
I surveyed torqued and inspected every Rock Bolt in the walls and up 180 feet at the ceiling of the Peace Power Powerhouse and created an 8' x 4' map.
The square pads in the ceiling were attached to 16' long rock bolts at Peace Power and were to be grouted.
When torques had stabilized, and retorquing was not required anymore, then thorough and complete High Pressure Grouting was maintained and continued until the void and all cracks were filled and bonded.
High
Pressure Grouting filled, sealed and bonded the Rocks and Cement and Rock bolts together.
All the Rock Bolts had a small diameter hole from the exposed bottom of the Bolt all the way to the top. Cement pours, streams and flows out of the bottom center hole from the top of the hole if the void is filled.